Product Details
Place of Origin: china
Certification: CE,ISO9001
Payment & Shipping Terms
Minimum Order Quantity: 100 square meters
Price: USD 25-100 per square meter/Negotiable
Packaging Details: Steel pallet
Delivery Time: 25-55 days
Payment Terms: T/T, L/C, Western Union,
Supply Ability: 20000 tons per month
|
Name:
|
Steel Frame Bridge
|
Fire Resistance:
|
Fireproof Coatings Available
|
Material:
|
High-strength Steel
|
Maintenance Requirement:
|
Low To Moderate
|
Environmental Impact:
|
Recyclable Materials Used
|
Installation Time:
|
4 To 12 Weeks Depending On Size
|
Durability:
|
50+ Years With Maintenance
|
Customizationoptions:
|
Available For Dimensions And Load Specifications
|
Corrosion Protection:
|
Hot-dip Galvanization
|
|
Name:
|
Steel Frame Bridge
|
|
Fire Resistance:
|
Fireproof Coatings Available
|
|
Material:
|
High-strength Steel
|
|
Maintenance Requirement:
|
Low To Moderate
|
|
Environmental Impact:
|
Recyclable Materials Used
|
|
Installation Time:
|
4 To 12 Weeks Depending On Size
|
|
Durability:
|
50+ Years With Maintenance
|
|
Customizationoptions:
|
Available For Dimensions And Load Specifications
|
|
Corrosion Protection:
|
Hot-dip Galvanization
|
This fireproof steel frame bridge is a durable steel bridge construction built from high-strength steel with hot-dip galvanization for corrosion protection. Featuring recyclable materials and a durability of 50+ years with maintenance, it offers customization options for dimensions and load specifications, with installation typically completed in 4 to 12 weeks depending on size.
| Attribute | Value |
|---|---|
| Customizationoptions | Available For Dimensions And Load Specifications |
| Fire resistance | Fireproof Coatings Available |
| Installation time | 4 To 12 Weeks Depending On Size |
| Environmental impact | Recyclable Materials Used |
| Maintenance requirement | Low To Moderate |
| Corrosion protection | Hot-dip Galvanization |
| Material | High-strength Steel |
| Name | Steel Frame Bridge |
| Durability | 50+ Years With Maintenance |
Q1: How long does the bridge last?
A: 50+ years with maintenance.
Q2: What corrosion protection is applied?
A: Hot-dip galvanization.
Q3: How long does installation take?
A: 4 to 12 weeks depending on size.