Product Details
Place of Origin: china
Certification: CE,ISO9001
Payment & Shipping Terms
Minimum Order Quantity: 100 square meters
Price: USD 25-100 per square meter/Negotiable
Packaging Details: Steel pallet
Delivery Time: 25-55 days
Payment Terms: T/T, L/C, Western Union,
Supply Ability: 20000 tons per month
|
Name:
|
Steel Framed Buildings
|
Specification:
|
40ft OT Or 40ft HQ
|
Surface Processing:
|
Painted Or Galvanized
|
Costefficiency:
|
Cost-effective Over Lifecycle
|
Technology:
|
Welded Steel, Hot Rolled Steel
|
Fireresistance:
|
Non-combustible And Fire-resistant
|
Maintenance:
|
Low Maintenance Requirements
|
Down Spout:
|
Round PVC Pipe
|
Surface:
|
Paint Or Hot DIP Galvanize
|
|
Name:
|
Steel Framed Buildings
|
|
Specification:
|
40ft OT Or 40ft HQ
|
|
Surface Processing:
|
Painted Or Galvanized
|
|
Costefficiency:
|
Cost-effective Over Lifecycle
|
|
Technology:
|
Welded Steel, Hot Rolled Steel
|
|
Fireresistance:
|
Non-combustible And Fire-resistant
|
|
Maintenance:
|
Low Maintenance Requirements
|
|
Down Spout:
|
Round PVC Pipe
|
|
Surface:
|
Paint Or Hot DIP Galvanize
|
These modern steel framed buildings are commercial prefab steel warehouses engineered for earthquake resistance and cost-effective performance. Featuring welded or hot-rolled steel technology, painted or galvanized surfaces, non-combustible fire-resistant design, and low maintenance requirements, they deliver durable, efficient commercial and storage space with complete AutoCAD and 3D3S drawing support.
| Attribute | Value |
|---|---|
| Name | Steel Framed Buildings |
| Fireresistance | Non-combustible And Fire-resistant |
| Maintenance | Low Maintenance Requirements |
| Down Spout | Round PVC Pipe |
| Surface | Paint Or Hot DIP Galvanize |
| Surface Processing | Painted Or Galvanized |
| Technology | Welded Steel, Hot Rolled Steel |
| Costefficiency | Cost-effective Over Lifecycle |
| Specification | 40ft OT Or 40ft HQ |
Q1: Is this suitable for commercial use?
A: Yes, it is designed for commercial warehouses and business facilities.
Q2: How is earthquake resistance achieved?
A: The steel frame is engineered to withstand seismic forces.
Q3: What finish options are available?
A: Painted or galvanized surface finishes.