Product Details
Place of Origin: china
Certification: CE,ISO9001
Payment & Shipping Terms
Minimum Order Quantity: 100 square meters
Price: USD 25-100 per square meter/Negotiable
Packaging Details: Steel pallet
Delivery Time: 25-55 days
Payment Terms: T/T, L/C, Western Union,
Supply Ability: 20000 tons per month
|
Product Name:
|
Steel Frame Commercial Building
|
Loadcapacity:
|
Designed To Withstand Heavy Loads
|
Thermalinsulation:
|
Includes Thermal Insulation Materials
|
Installationtime:
|
Rapid Installation, Typically Within Weeks
|
Durability:
|
Corrosion-resistant And Long-lasting
|
Constructionmethod:
|
Prefabricated And Assembled On-site
|
Soundinsulation:
|
Soundproofing Features Integrated
|
Material:
|
High-strength Steel
|
|
Product Name:
|
Steel Frame Commercial Building
|
|
Loadcapacity:
|
Designed To Withstand Heavy Loads
|
|
Thermalinsulation:
|
Includes Thermal Insulation Materials
|
|
Installationtime:
|
Rapid Installation, Typically Within Weeks
|
|
Durability:
|
Corrosion-resistant And Long-lasting
|
|
Constructionmethod:
|
Prefabricated And Assembled On-site
|
|
Soundinsulation:
|
Soundproofing Features Integrated
|
|
Material:
|
High-strength Steel
|
This heavy-duty steel frame commercial building is a corrosion-resistant prefabricated structure engineered for commercial use. Featuring high-strength steel, thermal insulation materials, soundproofing features, and prefabricated on-site assembly, it offers rapid installation within weeks and corrosion-resistant long-lasting durability.
| Attribute | Value |
|---|---|
| Durability | Corrosion-resistant And Long-lasting |
| Loadcapacity | Designed To Withstand Heavy Loads |
| Thermalinsulation | Includes Thermal Insulation Materials |
| Material | High-strength Steel |
| Installationtime | Rapid Installation, Typically Within Weeks |
| Product name | Steel Frame Commercial Building |
| Constructionmethod | Prefabricated And Assembled On-site |
| Soundinsulation | Soundproofing Features Integrated |
Q1: How fast is installation?
A: Rapid installation, typically within weeks.
Q2: Is the building prefabricated?
A: Yes, prefabricated and assembled on-site.
Q3: Does it include insulation?
A: Yes, thermal insulation materials.