Product Details
Place of Origin: Shandong, China
Brand Name: ECER
Certification: ISO 9001:2015
Model Number: BCS-10.9
Payment & Shipping Terms
Minimum Order Quantity: 100 Square Meters
Price: USD 30-58 / Square Meter
Packaging Details: Steel components with pre-drilled bolt holes packed in numbered bundles, bolt kits in sealed containers, complete assembly drawings included
Delivery Time: 15-25 working days after deposit
Payment Terms: T/T, L/C
Supply Ability: 30000 Tons per Year
|
Connection Type:
|
High-Strength Bolted (10.9 Grade)
|
Bolt Standard:
|
ISO 4014 / ISO 4017 Torque-Shear Bolts
|
Bolt Grade:
|
8.8 / 10.9 Grade High-Strength
|
Main Steel Frame:
|
Q235B / Q355B Welded H-Section Steel
|
Span Range:
|
10-40 Meters
|
Structural Warranty:
|
50 Years
|
Installation Time:
|
30-50% Faster Than Welded Structures
|
Surface Treatment:
|
Hot Dipped Galvanized / Painted
|
|
Connection Type:
|
High-Strength Bolted (10.9 Grade)
|
|
Bolt Standard:
|
ISO 4014 / ISO 4017 Torque-Shear Bolts
|
|
Bolt Grade:
|
8.8 / 10.9 Grade High-Strength
|
|
Main Steel Frame:
|
Q235B / Q355B Welded H-Section Steel
|
|
Span Range:
|
10-40 Meters
|
|
Structural Warranty:
|
50 Years
|
|
Installation Time:
|
30-50% Faster Than Welded Structures
|
|
Surface Treatment:
|
Hot Dipped Galvanized / Painted
|
The Bolt Connected Steel Structure Warehouse revolutionizes on-site construction with a fully bolted assembly system using ISO 4014 and ISO 4017 certified 10.9-grade high-strength torque-shear bolts. All steel components arrive at the job site with pre-drilled precision bolt holes, eliminating the need for heavy on-site welding and reducing total installation time by 30-50% compared to traditional welded structures.
| Connection Type | High-Strength Bolted Assembly |
| Bolt Standard | ISO 4014 / ISO 4017 |
| Bolt Grade | 8.8-Grade / 10.9-Grade Torque-Shear Bolts |
| Main Steel Frame | Q235B / Q355B Hot Rolled H-Section Steel |
| Span Range | 10-40 Meters |
| Structural Warranty | 50 Years |
| Surface Treatment | Hot Dipped Galvanized (≥275g/m²) / Painted |
| Installation Time | 30-50% Reduction vs. Welded Structures |
Remote location projects with limited welding access, fast-track construction schedules, seismic zones requiring ductile connections, temporary or relocatable warehouses, and projects where future expansion is anticipated.