Product Details
Place of Origin: Jiangsu, China
Brand Name: Feiang
Certification: ISO 9001:2015, CE
Model Number: SSB-740-005
Payment & Shipping Terms
Minimum Order Quantity: 200 Square Meters
Price: USD 28-45 per square meter / Negotiable
Packaging Details: Steel pallet with protective film, seaworthy bundle, container loading plan supplied
Delivery Time: 25-40 days after deposit
Payment Terms: T/T, L/C, Western Union
Supply Ability: 20000 tons per month
|
Span Width:
|
36m
|
Eave Height:
|
10m
|
Snow Load:
|
1.20 KN/m2
|
Seismic Grade:
|
8 Degree
|
Frame Material:
|
Welded H Beam Q355B
|
Bracing:
|
Cross Tie Rod Bracing
|
Roof Panel:
|
0.6mm Insulated Metal Panel
|
Surface Treatment:
|
Hot Dip Galvanized
|
Lifespan:
|
50 Years
|
Certification:
|
ISO 9001:2015, CE
|
|
Span Width:
|
36m
|
|
Eave Height:
|
10m
|
|
Snow Load:
|
1.20 KN/m2
|
|
Seismic Grade:
|
8 Degree
|
|
Frame Material:
|
Welded H Beam Q355B
|
|
Bracing:
|
Cross Tie Rod Bracing
|
|
Roof Panel:
|
0.6mm Insulated Metal Panel
|
|
Surface Treatment:
|
Hot Dip Galvanized
|
|
Lifespan:
|
50 Years
|
|
Certification:
|
ISO 9001:2015, CE
|
Product Overview
36m wide prefabricated metal building with reinforced bracing for heavy snow load regions and high seismic zones. The structure is designed and fabricated to your project loads, with shop drawings, packing lists and erection guidance supplied for every shipment.
Specifications
| Span Width | 36m |
| Eave Height | 10m |
| Snow Load | 1.20 kN/m2 |
| Seismic Grade | 8 Degree |
| Frame Material | Welded H Beam Q355B |
| Bracing | Cross Tie Rod Bracing |
| Roof Panel | 0.6mm Insulated Metal Panel |
| Surface Treatment | Hot Dip Galvanized |
| Lifespan | 50 Years |
| Certification | ISO 9001:2015, CE |
| Model Number | SSB-740-005 |
| Place of Origin | Jiangsu, China |
Application Scenarios
Bulk material storage halls, cold region warehouses, mining equipment shelters, transit depots
Key Advantages
FAQ
Q: How do you verify the snow load capacity?
A: We run a structural calculation per your local code and issue the calculation sheet together with the shop drawings.
Q: Which foundation is required?
A: Independent concrete footings under each column, sized from the reaction forces shown on our foundation drawing.