Product Details
Place of Origin: Jiangsu, China
Brand Name: Feiang
Certification: ISO 9001:2015, CE
Model Number: SSB-740-007
Payment & Shipping Terms
Minimum Order Quantity: 200 Square Meters
Price: USD 28-45 per square meter / Negotiable
Packaging Details: Steel pallet with protective film, seaworthy bundle, container loading plan supplied
Delivery Time: 25-40 days after deposit
Payment Terms: T/T, L/C, Western Union
Supply Ability: 20000 tons per month
|
Span Width:
|
15m
|
Eave Height:
|
9m
|
Mezzanine Load:
|
3.5 KN/m2
|
Frame Material:
|
Hot Rolled H Beam Q355B
|
Floor Deck:
|
Steel Deck With Concrete Slab
|
Wall Panel:
|
75mm Sandwich Panel
|
Stairs:
|
Steel Stair With Handrail
|
Lifespan:
|
50 Years
|
Surface Treatment:
|
Epoxy Painted
|
Certification:
|
ISO 9001:2015, CE
|
|
Span Width:
|
15m
|
|
Eave Height:
|
9m
|
|
Mezzanine Load:
|
3.5 KN/m2
|
|
Frame Material:
|
Hot Rolled H Beam Q355B
|
|
Floor Deck:
|
Steel Deck With Concrete Slab
|
|
Wall Panel:
|
75mm Sandwich Panel
|
|
Stairs:
|
Steel Stair With Handrail
|
|
Lifespan:
|
50 Years
|
|
Surface Treatment:
|
Epoxy Painted
|
|
Certification:
|
ISO 9001:2015, CE
|
Product Overview
15m span two story prefabricated metal building combining a ground floor workshop with a mezzanine office floor. The structure is designed and fabricated to your project loads, with shop drawings, packing lists and erection guidance supplied for every shipment.
Specifications
| Span Width | 15m |
| Eave Height | 9m |
| Mezzanine Load | 3.5 kN/m2 |
| Frame Material | Hot Rolled H Beam Q355B |
| Floor Deck | Steel Deck With Concrete Slab |
| Wall Panel | 75mm Sandwich Panel |
| Stairs | Steel Stair With Handrail |
| Lifespan | 50 Years |
| Surface Treatment | Epoxy Painted |
| Certification | ISO 9001:2015, CE |
| Model Number | SSB-740-007 |
| Place of Origin | Jiangsu, China |
Application Scenarios
Small factories, workshop with office, retail workshop units, processing plants
Key Advantages
FAQ
Q: Can the mezzanine be extended later?
A: Yes. Secondary beams can be bolted on in a later phase if the main frame is designed with reserve capacity.
Q: Is the concrete slab included?
A: The steel deck is supplied by us and the concrete is poured on site by your local contractor.