Product Details
Place of Origin: china
Certification: CE,ISO9001
Payment & Shipping Terms
Minimum Order Quantity: 100 square meters
Price: USD 25-100 per square meter/Negotiable
Packaging Details: Steel pallet
Delivery Time: 25-55 days
Payment Terms: T/T, L/C, Western Union,
Supply Ability: 20000 tons per month
|
Product Name:
|
Steel Factory Buildings
|
Usage:
|
Manufacturing, Warehousing, Workshops
|
Design Standard:
|
International Building Codes
|
Building Height:
|
Customizable, Typically 6-12 Meters
|
Installation Time:
|
4-8 Weeks Depending On Size
|
Fire Resistance:
|
Fireproof Coatings Available
|
Customization:
|
Available According To Client Requirements
|
Durability:
|
Corrosion-resistant With Protective Coating
|
|
Product Name:
|
Steel Factory Buildings
|
|
Usage:
|
Manufacturing, Warehousing, Workshops
|
|
Design Standard:
|
International Building Codes
|
|
Building Height:
|
Customizable, Typically 6-12 Meters
|
|
Installation Time:
|
4-8 Weeks Depending On Size
|
|
Fire Resistance:
|
Fireproof Coatings Available
|
|
Customization:
|
Available According To Client Requirements
|
|
Durability:
|
Corrosion-resistant With Protective Coating
|
These 6m-12m height steel factory buildings are fireproof industrial factory buildings for manufacturing, warehousing, and workshops. Designed to international building codes with fireproof coatings and corrosion-resistant protective coatings, they feature customizable building heights typically from 6 to 12 meters, with installation time of 4-8 weeks depending on size.
| Attribute | Value |
|---|---|
| Usage | Manufacturing, Warehousing, Workshops |
| Design standard | International Building Codes |
| Installation time | 4-8 Weeks Depending On Size |
| Product name | Steel Factory Buildings |
| Durability | Corrosion-resistant With Protective Coating |
| Fire resistance | Fireproof Coatings Available |
| Customization | Available According To Client Requirements |
| Building height | Customizable, Typically 6-12 Meters |
Q1: What building heights are available?
A: Customizable, typically 6-12 meters.
Q2: Is the building fireproof?
A: Yes, fireproof coatings are available.
Q3: How long does installation take?
A: 4-8 weeks depending on size.