Product Details
Place of Origin: china
Certification: CE,ISO9001
Payment & Shipping Terms
Minimum Order Quantity: 100 square meters
Price: USD 25-100 per square meter/Negotiable
Packaging Details: Steel pallet
Delivery Time: 25-55 days
Payment Terms: T/T, L/C, Western Union,
Supply Ability: 20000 tons per month
|
Product Name:
|
Metal Building Factory
|
Design Standard:
|
International Building Codes
|
Foundation Type:
|
Concrete Foundation
|
Customization:
|
Available According To Client Requirements
|
Fire Resistance:
|
Fireproof Coatings Available
|
Installation Time:
|
4-8 Weeks Depending On Size
|
Usage:
|
Manufacturing, Warehousing, Workshops
|
Span Width:
|
Up To 60 Meters
|
|
Product Name:
|
Metal Building Factory
|
|
Design Standard:
|
International Building Codes
|
|
Foundation Type:
|
Concrete Foundation
|
|
Customization:
|
Available According To Client Requirements
|
|
Fire Resistance:
|
Fireproof Coatings Available
|
|
Installation Time:
|
4-8 Weeks Depending On Size
|
|
Usage:
|
Manufacturing, Warehousing, Workshops
|
|
Span Width:
|
Up To 60 Meters
|
This industrial metal building factory is a prefabricated steel frame warehouse for manufacturing, warehousing, and workshops. Featuring fireproof coatings, concrete foundations, and spans up to 60 meters, it is designed to international building codes with installation time of 4-8 weeks depending on size and full customization.
| Attribute | Value |
|---|---|
| Customization | Available According To Client Requirements |
| Usage | Manufacturing, Warehousing, Workshops |
| Fire resistance | Fireproof Coatings Available |
| Installation time | 4-8 Weeks Depending On Size |
| Product name | Metal Building Factory |
| Span width | Up To 60 Meters |
| Design standard | International Building Codes |
| Foundation type | Concrete Foundation |
Q1: What is the maximum span?
A: Up to 60 meters.
Q2: Is fire protection available?
A: Yes, fireproof coatings.
Q3: How long does installation take?
A: 4-8 weeks depending on size.